Handy Home Products 18502-1 Instruction Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
5
SITE PREPARATION
Site must be properly leveled.
Site should have natural drainage
and no standing water
A
B
C
4"
(10 cm)
3-1/2"
(8.9 cm)
A) Purchase our optional Floor Kit or
build your own wood floor.
Building Size
A
10’ x 8’ (244 x 244 cm)
120” (305 cm)
Fasten treated 2x4 sill plates to slab using approved
concrete anchors. (Treated sill plates and fasteners not
included.)
B) Concrete Slab Foundation
A
B
FOUNDATION OPTIONS
(Not supplied with kit)
YOU MUST ASSEMBLE YOUR BUILDING ON A
WOOD FLOOR OR CONCRETE SLAB.
OPCIONES PARA LA CIMENTACIÓN
(No incluidas)
HAY QUE CONSTRUIR EL EDIFICIO SOBRE UN BASE
DE MADERA O DE CONCRETO.
Important: Square floor and level to ground
before beginning assembly of building.
A) Compre nuestro equipo opcional para el
suelo o construya su propio suelo de madera.
B) Base en losa de concreto
Treated Sill
AB
96” (244 cm)
120” (305 cm) 144” (366 cm)
120” (305 cm) 192” (488 cm)
10’ x 12’ (244 x 366 cm)
10’ x 16’ (244 x 488 cm)
Building Size
A
10’ x 8’ (244 x 244 cm)
120” (244 cm)
AB
96” (244 cm)
120” (244 cm)
144” (366 cm)
120” (244 cm)
192” (488 cm)
10’ x 12’ (244 x 366 cm)
10’ x 16’ (244 x 488 cm)
Dimensiones del edificio
A
C
89” (226 cm)
137” (348 cm)
185” (470 cm)
Soleras Inferiors Tratadas
PREPARACIÓN DEL SITIO
El sitio debe de estar nivelado correctamente.
Instale una barrera contra yerbajos debajo de la
estructura.
Importante: Asegure que el suelo está nivelado y
escuadrado antes de construir el edificio.
Fije las soleras inferiores tratadas 2x4 a la losa con anclajes
de concreto aprobados. (Las soleras y los anclajes no están
incluidos.)
Dimensiones del edificio
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 45 46

Comments to this Manuals

No comments